GALLERY
Our Portfolio
Complete Bathroom, Kitchen & Interior Upgrades & Refurbishments

KINGSWAY
LATEST PROJECT
Bath Removal
We removed outdated bath tiles, wall fittings, and the bath itself, creating a modern shower with a custom-built ceramic shelf.
What The Client Said
JAN BRIDGES
Chris and Alex have just replaced my bath with a walk-in shower and it looks amazing. They did a very clean and tidy job and made sure I was never without water for very long! I was always consulted when there were options, to endure the shower was just the way I wanted it. They are friendly, respectful and trustworthy and I can thoroughly recommend them.

BEFORE

AFTER
EBLEY
Bathroom Refresh With New Suite
We refitted the new bathroom units and made necessary alterations to fit out a new bathroom to the client’s specifications.
What The Client Said
PAMELA HARDING
Highly recommend Lowthers Interiors
From the very good quote and discussion about my bathroom refit, to the work being completed.
I am pleased to have found a good honest, company, and have already booked in more work.
Love my new bathroom




AVENING
Bathroom Reform
The idea was to create a large shower enclosure, retile the bathroom, fit a new toilet and replaster the walls and ceiling.
STRATTON
Bathroom Refit
Removed the original bathroom suite, built an oak vanity top with a cupboard below, housed in tongue and groove panelling, which was continued throughout the room. Fitted a new bathroom suite and wetroom screen and wallpapered and decorated throughout.

STROUD
Bathroom Relocation
Relocated bathroom in a Victorian property. Removed flooring, strengthened floor joists to lay tiling, tile floor. Built chimney breast and framed up in the room for hidden cupboards, cupboard to conceal boiler and a structure for the shower stall. Made pocket ceiling and fully panelled walls which were spray finished in enamel paint. Installed bathroom suite to suit the style of the Victorian property.




GLOUCESTER
Bathroom Redesign
This was a very small bathroom that needed to be redesigned to maximise the shower area and still be comfortable for the family to use. The design focused primarily on building a large shower stall with a partitioned vanity area. The bathroom was built from the ground up by first pouring the floor prior to tiling, before renovating the walls, prior to fully tiling throughout.
MORETON-ON-MARSH
Kitchen Installation
Stripped out the existing kitchen, repaired and plastered the walls. Installed plumbing, self-levelled the floors throughout the kitchen and connecting hallway and then tiled the floor. Fitted the kitchen supplied by the client tiled the walls and fitted all appliences.